High pressure inflation priority management board

€1,150.00
Tax included Shipment within 5 days
Price excluding tax / DOM-TOM €958.33
STASTODEVERSEUR

Automatic cascade for inflation priority management



100% secure payments
Shipping
Free Shipping From 89 € for France * * See conditions
Product return & exchange 14 days to change your mind
24/7 support 24/7 customer return guaranteed
100% secure payment By credit card, bank transfer, PayPal or check
High pressure inflation priority management board

Inflation priority management set

The overflow valve allows you to give priority to the inflation of the dive blocks when the pressure in the buffer cylinders is too low.

With this system, as soon as the pressure is below 240 bars* in your buffer tank racks, the compressor inflates the dive blocks directly before reinflating the buffer tanks. The time to inflate the blocks is therefore very fast and you do not have to wait for the compressor to inflate simultaneously the volume of your diving blocks + the volume of the buffer tanks.

This technology has been used since 2001 in fire and rescue centers and allows in a simple and automatic way to avoid having to manage isolation valves. The use of a spillway plate makes it possible to relegate the technique of cascade inflation via valve manipulation to the time of prehistory.

The system is designed to allow the buffers to be emptied completely if necessary in order to optimize your inflation times.

Specify the type of inlet/outlet connection when ordering: 8S, 6S or COLTRI type.

* Adjustable pressure according to your needs.

304L stainless steel plate allowing also the optional addition of a pressure relief station for inflation ramp and safety valve for inflation ramp (consult us).

8 autres équipements de plongée dans Rampes pour stations de gonflage
Return top